Concrete Block Calculator

How many concrete blocks a wall needs, plus the mortar, and the cost — from the wall size and the block you are using.

How many blocks to order for the wall.

Results update as you type
Results
Blocks needed
249
Before waste
Net wall area
Blocks per square metre
Bags of mortar mix (20 kg)
Mortar volume (m³)
Block cost
Courses high
Reviewed September 2026. Geometry is the same everywhere; units, bag sizes and sheet sizes follow your region and can be switched. Stairs are in Approved Document K; ramps in Document M.
No account required · Google Analytics off unless allowedCalculator arithmetic runs in your browserResults update as you type
All calculations run 100% in your browser. The calculator code does not submit your figures to GlobalCalc to obtain a result.
About concrete block

How the concrete block calculator works

Blocks are counted by area: wall area divided by the face area of one block including its mortar joint. A standard 390 × 190 block with a 10 mm joint covers 0.08 m², so a square metre takes 12.5 blocks.

Mortar is the joint volume — roughly 0.02 m³ per square metre of 10 mm joints in blockwork, which is about one 20 kg bag of mix per square metre. Both figures here include a waste allowance you can set.

Formula: blocks = wall area / (block length × height, joints included)

Worked examples

InputsBlocks neededNote
10 × 2.4 m wall, 390 × 190 blocks315315 blocks
With a 2 m² door289about 26 blocks fewer
UK 440 × 215 blocks249fewer, larger blocks

Frequently asked questions

How many blocks per square metre?

With a standard 390 × 190 block and a 10 mm joint, 12.5. UK 440 × 215 blocks give about 10 per square metre.

How much mortar do I need?

Roughly 0.02 m³ per square metre of blockwork — about two 20 kg bags of mix per square metre, though the exact figure depends on joint thickness and how much you waste.

Should I deduct windows and doors?

Yes for anything over about a square metre. Small openings are usually left in as a buffer against cutting waste.

How much waste should I allow?

5% for a simple rectangular wall, 10% or more where there is a lot of cutting around openings and corners.

Do I need to allow for the bond?

Half-bond blockwork produces a half block at the end of alternate courses. That is what the waste allowance covers.

Where these figures come from

Last checked: September 2026. Coverage rates and material sizes are typical manufacturer figures — check the product you buy.