Labour Productivity Calculator

Output per labour hour and per person, the labour cost per unit that follows, and what a productivity improvement is worth in units, cost and headcount.

Labour productivity is output divided by hours worked.

Results update as you type
Results
Units per labour hour
9.375
Units per person in the period
Labour hours
Labour cost per unit
Units per hour after the improvement
Labour cost per unit after
Cost per unit reduction
People needed for the same output after
Extra units with the same people after
Reviewed September 2026. Operations arithmetic: the same measures in every plant, in your own units. PUWER and LOLER obligations on work equipment apply regardless of any efficiency target.
No account required · Google Analytics off unless allowedCalculator arithmetic runs in your browserResults update as you type
All calculations run 100% in your browser. The calculator code does not submit your figures to GlobalCalc to obtain a result.
About labour productivity

How the labour productivity calculator works

Labour productivity is output divided by hours worked. It is the number that decides whether a plant can grow without hiring, and the labour cost per unit that drops out of it is what the finance team actually watches.

A 10% productivity gain does not save 10% of labour cost per unit — it saves 9.1%, because the denominator moves. Small distinction, but it is the difference between a forecast that holds and one that does not.

Formula: productivity = units / hours; labour cost per unit = rate / productivity

Worked examples

InputsUnits per labour hourNote
48,000 units from 32 people9.3759.4 units per hour
A 25% gain9.375a fifth fewer people
Higher labour rate9.375more labour in each unit

Frequently asked questions

What is labour productivity?

Output per hour of labour. It is the cleanest measure of how much a process gets from the people in it, and the one that decides whether growth needs hiring.

Why does a 10% gain not cut cost by 10%?

Because cost per unit is rate over productivity, and 1/1.1 is 0.909. A 10% productivity gain is a 9.1% cost reduction; a 100% gain is a 50% one.

What is a loaded labour rate?

Wages plus on-costs — leave, insurance, retirement contributions, supervision. It is typically 1.3 to 1.6 times the hourly wage.

Should I count indirect labour?

For unit cost, yes — maintenance, quality and supervision are real. For measuring a line's own improvement, direct labour only is cleaner.

What drives productivity?

Downtime, changeovers, rework and waiting, far more than how fast people work. The other pages in this family measure each of those.

Where these figures come from

Last checked: September 2026. Definitions follow standard operations-management practice; where plants commonly differ, the page says so.