Part of the Construction & Building suite · 49 calculators

Concrete Tube Calculator

Concrete for cylindrical form tubes — deck footings, posts and piers — per tube and for the whole job.

Concrete for tube footings.

Millimetres in metric; inches in imperial
Results update as you type
Results
Total concrete
0.583
Per tube
Litres per tube
Bags needed
Bags per tube
Weight (tonnes)
Before waste
Reviewed September 2026. Geometry is the same everywhere; units, bag sizes and sheet sizes follow your region and can be switched. Stairs are in Approved Document K; ramps in Document M.
No account required · Google Analytics off unless allowedCalculator arithmetic runs in your browserResults update as you type
All calculations run 100% in your browser. The calculator code does not submit your figures to GlobalCalc to obtain a result.
About concrete tube

How the concrete tube calculator works

A form tube is a cylinder: πr²h. The trap is the units — tube diameters are quoted in inches or millimetres while depths are in feet or metres, and getting that wrong by a factor is the single most common ordering mistake.

A 250 mm tube 900 mm deep takes 44 litres, so a deck on twelve of them needs 0.53 m³ — comfortably a bagged job, but only just.

Formula: V = π (d/2)² h per tube

Worked examples

InputsTotal concreteNote
Twelve 250 mm tubes, 900 mm deep0.5830.58 m³ with waste
With a 2× bell footing0.886noticeably more
A single post0.09393 litres

Frequently asked questions

How much concrete in a form tube?

A 250 mm tube takes about 49 litres per metre of depth; a 300 mm tube about 71 litres per metre.

How deep should footings go?

Below the frost line where there is one, and to bearing soil everywhere. Local code governs — 900 mm is common in temperate Australia, far deeper in cold climates.

What is a bell footing?

A flared base that spreads the load over more soil and resists frost heave lifting the pier out.

Should I order ready-mix for deck footings?

Twelve tubes is around 0.5 m³, which is under most minimum delivery charges. Bags usually win at that scale.

Do I leave the tube in place?

The buried part, yes. Trim the exposed portion flush after the pour — the cardboard degrades and looks poor.

Where these figures come from

Last checked: September 2026. Coverage rates and material sizes are typical manufacturer figures — check the product you buy.