Run of Show Calculator

A running order with start and end times for every segment, from the event's start time and the length of each part — with the finish time, the total running time and how much buffer is left before a hard stop.

A run of show is arithmetic with times: each segment starts when the last one ends.

Results update as you type
Results
Finish time
22:50
Schedule
Total running time (minutes)
Total running time (hours)
Segments
Longest segment
Buffer before the hard stop (minutes)
Reading
Reviewed September 2026. Catering and layout conventions are broadly international; licensing and capacity rules are local and deliberately excluded. US food service is regulated at state and county level under the FDA Food Code, so requirements vary locally.
No account required · Google Analytics off unless allowedCalculator arithmetic runs in your browserResults update as you type
All calculations run 100% in your browser. The calculator code does not submit your figures to GlobalCalc to obtain a result.
About run of show

How the run of show calculator works

A run of show is arithmetic with times: each segment starts when the last one ends. Enter the start time and the minutes for each part — arrival, welcome, speeches, dinner, entertainment, close — and the schedule follows, including the finish. Compare it with the venue's hard stop and the buffer is what is left for overruns, which every event has.

Formula: start_i = start_{i−1} + duration_{i−1}; finish = start + Σ durations

Worked examples

InputsFinish timeNote
A gala dinner from 18:3022:50finishes 22:50
A longer dinner23:20the buffer shrinks
A morning conference13:35overruns

Frequently asked questions

What is a run of show?

The minute-by-minute schedule of an event: what happens when, who is on, and what the crew cues. This page builds the timeline; the cues are yours to add.

How much buffer should I keep?

Ten to fifteen per cent of the running time, or at least fifteen minutes before a hard stop. Speeches overrun; dinners overrun; nothing finishes early.

Where do overruns come from?

Speeches, mostly — then service, then guests arriving late. Give the speech slot a firm length and a visible clock.

What if the event runs past midnight?

Enter times in 24-hour form and the page carries over to the next day, marking the finish. A hard stop earlier than the start is taken as the following morning.

Should turnaround time be a segment?

Yes — a room reset from theatre to banquet is 20 to 40 minutes of nothing happening and belongs in the schedule as its own line.

Where these figures come from

Last checked: September 2026. Portion and spacing figures are standard catering and event-industry conventions, stated on each page.