Façade Panel Count Calculator

How many cladding panels an elevation needs from its dimensions and the panel module — with the part-panels at the edges, the waste they create, and what a different module would save.

Panels across is the width divided by the panel width, rounded up; panels down likewise.

Results update as you type
Results
Panels required
44
Panels across
Panels down
Part panels at the edges
Waste from cutting
Panels after deducting openings
Cost
Panel width that divides the elevation evenly (m)
Reviewed September 2026. Building physics and geometry are the same everywhere; only the code thresholds move. The NCC sets occupant load, egress, ceiling height and energy provisions; a certifier applies them.
No account required · Google Analytics off unless allowedCalculator arithmetic runs in your browserResults update as you type
All calculations run 100% in your browser. The calculator code does not submit your figures to GlobalCalc to obtain a result.
About façade panel count

How the façade panel count calculator works

Panels across is the width divided by the panel width, rounded up; panels down likewise. The rounding is the waste: an elevation 12.4 metres wide in 1.2-metre panels needs 11 panels, the last of which is a third cut away.

Choosing a module that divides the elevation evenly — or adjusting the elevation to suit the module — is the cheapest façade decision there is.

Formula: panels = ceil(W / w) × ceil(H / h); waste = panel area − elevation area

Worked examples

InputsPanels requiredNote
12.4 by 9.3 m in 1.2 by 3 m panels4444 panels, some cut
A panel that fits30no waste
Smaller panels147four times the count

Frequently asked questions

How do I count façade panels?

Width over panel width rounded up, times height over panel height rounded up. The rounding up is where the waste comes from.

How do I reduce waste?

Choose a module that divides the elevation, or set the elevation to a multiple of the module. Moving a wall 200 mm can save a whole column of cut panels.

What about openings?

Panels around windows are cut, not omitted, so the deduction here is approximate. Detailed setting-out around openings always needs a drawing.

Do the part panels cost the same?

Usually more — the cut, the handling and the waste. Suppliers often charge a full panel for anything over half.

Is this parametric design?

It is the arithmetic parametric tools automate. A script that varies the module and reports the waste is doing exactly this, thousands of times.

Where these figures come from

Last checked: September 2026. Formulas are the standard building-science and code relationships; default thresholds are common international values and should be replaced with the ones in your code.