Lead Time Calculator

Total lead time from order to delivery, built from its parts — processing, procurement, production, queueing and shipping — and how much of it is actually work.

Lead time is the sum of every stage an order passes through, and in most operations the parts are dominated by waiting: a job that takes six hours of work sits in queues for six days.

Results update as you type
Results
Total lead time (days)
18.5
Days of actual work
Days of waiting
Process efficiency
Largest stage
Against the promize
Lead time if queueing were halved (days)
In weeks
Reviewed September 2026. Operations arithmetic: the same measures in every plant, in your own units. OSHA machine guarding and lockout/tagout standards apply regardless of throughput targets.
No account required · Google Analytics off unless allowedCalculator arithmetic runs in your browserResults update as you type
All calculations run 100% in your browser. The calculator code does not submit your figures to GlobalCalc to obtain a result.
About lead time

How the lead time calculator works

Lead time is the sum of every stage an order passes through, and in most operations the parts are dominated by waiting: a job that takes six hours of work sits in queues for six days. The share that is genuine work is the process efficiency, and single digits are common.

The lever is almost never speeding up the work. It is removing the waiting, which is what every lean improvement is actually doing.

Formula: lead time = Σ stage days; efficiency = work days / lead time

Worked examples

InputsTotal lead time (days)Note
A typical make-to-order flow18.518.5 days, 16% work
Stock on hand11.5a week shorter
A tight promize18.5over by more than a week

Frequently asked questions

What is lead time?

The elapsed time from order to delivery — every stage, including the waiting. It is what the customer experiences and what stock has to cover.

What is process efficiency?

The share of lead time that is actual work. Under 10% is normal and shocking; it says most of the time an order spends is in a queue.

How do I reduce lead time?

Attack the waiting, not the work. Smaller batches, fewer handoffs and stock of long-lead materials remove days; speeding up a two-day production step saves hours.

Why does the promize matter?

Because a promize the process cannot meet is met by expediting, which costs more than the lead time it saves and disrupts every other order.

Is shipping part of lead time?

To the customer, yes. Measure what they experience, from the moment they order to the moment they have it.

Where these figures come from

Last checked: September 2026. Definitions follow standard operations-management practice; where plants commonly differ, the page says so.