Part of the Manufacturing & Industry suite · 26 calculators

Cost Per Part Calculator

The cost to make one part — material, labour, machine time, tooling amortised over the run and overhead — and how the unit cost falls as the batch grows.

Unit cost has two kinds of component.

Results update as you type
Results
Cost per good part
18.009
Variable cost per part
Setup and tooling per part
Overhead per part
Scrap loading per good part
Total cost of the run
Cost per part at ten times the quantity
Quantity where setup equals variable cost per part
Reviewed September 2026. Operations arithmetic: the same measures in every plant, in your own units. Production targets computed here carry no weight against WHS duties; plant and machinery obligations are set by the model WHS laws.
No account required · Google Analytics off unless allowedCalculator arithmetic runs in your browserResults update as you type
All calculations run 100% in your browser. The calculator code does not submit your figures to GlobalCalc to obtain a result.
About cost per part

How the cost per part calculator works

Unit cost has two kinds of component. Material, labour and machine time scale with each part. Tooling and setup are paid once per run, and their share per part falls as the run grows — which is why a quote for 100 and a quote for 10,000 differ by far more than the material.

The break-even quantity shows where the fixed costs stop dominating: below it, the setup is the price; above it, the part is.

Formula: unit cost = variable per part + (tooling + setup) / quantity + overhead

Worked examples

InputsCost per good partNote
A run of 50018.009setup is a fifth of the cost
A run of 5045.8441setup dominates
A run of 5,00015.2255close to the variable cost

Frequently asked questions

How is cost per part calculated?

Material plus machine time plus labour per part, plus the run's setup and tooling divided by the quantity, plus overhead — then loaded for the parts that get scrapped.

Why does a bigger order cost less per part?

Because setup and tooling are paid once and spread over more parts. Below the break-even quantity the setup is most of the price.

What machine rate should I use?

The fully burdened hourly cost — depreciation, power, maintenance, floor space and the operator if not counted separately. Sixty to two hundred an hour covers most machine tools.

How does scrap affect the price?

You pay to make every part but sell only the good ones, so the good-part cost is divided by the yield. Three per cent scrap adds about three per cent to the price.

Should overhead be a percentage?

It is the common convention. Activity-based costing is more accurate and far more work; a percentage is right for a quote.

Where these figures come from

Last checked: September 2026. Definitions follow standard operations-management practice; where plants commonly differ, the page says so.